Voltage Level: 225kV
Transmission Lines: 278km double-circuit on the same tower
Substation Scale: 4 substations in total: Nyabissan, Ebolowa, Ahala, and Nkol Nkumu
Supporting Power Station: Memve'ele Hydroelectric Station, 211MW
Line Route: Memve'ele Station → Ebolowa → Ahala → Yaoundé Nkol Nkumu Station
Project Model: Equipment Supply + System Integration + Installation & Commissioning Guidance
Cameroon's highest voltage level and largest 225kV transmission and distribution backbone grid project.
CYG SUNRI's benchmark project for large-scale hydroelectric power station transmission and transformation in Central Africa.
Complete set of secondary equipment operating stably, ensuring reliable power supply for the capital Yaoundé and the southern region.
Overcame harsh environments including tropical rainforests, swamps, and high temperature & humidity to achieve long-term stable operation.
Highly recognized by the Cameroonian power company and the POWERCHINA EPC contractor.